ORBITAL GASLINE WELDMENTS

 

Fusion WELDING OF TUBES AND PIPE department is equipped with AMI Model 207 microprocessor - controlled power supply. The latest advances in semiconductor and welding power supply technology.

The whole welding process is performed in a well designed CLEAN ROOM constructed by Applied Materials.

Clean room Specification:

Temperature:  65-75 F

Humidity: 30-60% RH

Pressurization: Up to 0.15" wg positive

Cleanliness: Design requirement as per FED Std 209